Waste sorting plant
50 000 ton per year
SECONDARY RAW
MATERIAL
WORKING HOURS
PER YEAR
2800
7-10
%
WORKING HOURS PER SHIFT
8
SHIFTS PER DAY
1
DESCRIPTION
Required staff — 12 people.
A complete solution for sorting solid household waste for small landfills. The capacity of such a complex is 50 thousand tons per year. The plant is designed to work 350 days a year with a work shift of 8 hours a day.

Equipment installed:
1. Control point
2. Feed conveyor
3. Climate cabin on the sorting platform
4. Drum crash
5. Reversible conveyor
6. Bunker 27-36 cubic meters
7. Shipping conveyor
8. Sorting conveyor
9. Magnetic separator
SIMILAR MODELS